|
SWAY BRIDGE
The sway bridge support
structure and ramp frames are constructed of welded steel tubing that
are then
sandblasted and powder coated in pretty much any color you want. The
bridge is 6 1/2 feet in length and the ramps are 2ft wide by 4ft long.

The ramps are
covered with 1/2" exterior grade plywood that is primed and painted with
a non-skid textured paint in any color you want. The ramps are
attached to the support structure with solid steel pins that are easily
removed and are extremely sturdy and stable.

The bridge is
constructed of 2x2 wood that is also primed and painted with a non-skid
textured paint in any color you want. The 2x2s have holes drilled
in them and two steel cables are threaded through the 2x2s to hold the
bridge together with 1/4" thick nylon spacers placed between each 2x2. The bridge is attached to rings welded on the
support structure with turnbuckles and snap clips that are easily
removed for disassembly.

 |